The convergence rate corresponding to the standard
-method with shift
is the following:
![]() |
(8) |
Calculating an upper bound for the convergence, in case of
, independent from
, we obtain:
![]() |
The above formula shows that up to a constant both convergence rates
are almost equal.
In case
, we get an even better convergence rate
(this will be shown in the numerical experiments). In case
, we get a delay. This delay can be arbitrarily
large, when choosing outrageous values for
. But normally
is located within the bounds of the spectrum and does
therefore not tend to create a large delay. In the following example
we show that the effect of the
is quite limited.
The constraints posed on
are not so
strong and quite often they are satisfied in a natural manner.
Similarly as above one can derive an upper bound for
the convergence based on the shift
.
Define the following
constants:
Reconsidering now the following 3 sets
,
and
and let
and let
.
From the equations above one can see that, under some mild conditions,
convergence will occur both at the top and at the bottom level at the
same convergence rates as the
-method would converge.
Raphael Vandebril 2007-12-10